Sunday, January 8, 2012

All caught up and making progress!

This is my fourth post of the night and I think I have caught up with blogging about most of what has been done so far. I posted the before pics, about the plumbing, and the egress window.

This weekend Marc finished a bunch of framing on this side wall and around the corner, framing out the egress window, and finishing up some other projects. We talked about all that has to be done and did a rough estimate of the time it should take. We are feeling encouraged about continuing to make progress on this again!

The egress window is in the bedroom.

This shows the master bedroom and closet area - the egress window is just to the left of this.

Egress window

This was done on October 4th, 2011. Ryan was pretty excited and hated to go to school that morning!

A happy contractor??


They made this all look REALLY easy!


Initial plumbing

Just a quick post to show the plumbing work that was done for the bathroom. This was done in August 2011. We hired a plumber for this as the township requires it to be done by a master plumber.

The pump was placed under the stairs.



Catching up . . .

Since the last time I posted, a handful of things have gotten done and work is being done again!

First, here are the before pics, though there was some framing around the patio door by the time these were taken.

This shows the utility area that will remain unfinished. A wall will go up in front of this.


This area will be the master bedroom and closet, including the washer and dryer.

Patio door leading to stairs that go to the backyard. There will be a living room/entry area there.

This area will be the kitchen, and across from it will be a family room and eating area.

Ok, those are the before pics. I will post with a few more updates soon!